Lülita hõlbustusrežiim sisse
Lülita hõlbustusrežiim välja
Jäta lindikäsud vahele
Põhisisu juurde
Lülita animatsioonid välja
Lülita animatsioonid sisse
JälgiJälgi Sisule keskendumine Sisule keskendumine
ACER
Töö ühtse energiaturu saavad kasu kõik ELi tarbijad
  • Gas
  • Terviklikkuse ja läbipaistvuse
  • Elekter
  • HeaderTagline
Otsing
Keeles:
  • Amet
    • ​Struktuur
      • ACER Departments
      • Administrative Board
        • AB Decisions of 2019
        • AB Decisions of year 2017
        • AB Decisions of year 2018
        • Agnieszka KAZMIERCZAK
        • Anne MONTAGNON
        • Britta THOMESN
        • Decisions
        • Diego VAZQUEZ TEIJERA
        • Dominique RISTORI
        • Dr. Jochen PENKER
        • Dr. Romana JORDAN
        • Edit HERCZOG
        • Edmund HOSKER
        • Florian ERMACORA
        • Georgios SHAMMAS
        • Jurijs SPIRIDONOVS
        • Ľubomír KUCHTA
        • Martin HANSEN
        • Meetings: Agenda, Background Documents
        • Members
        • Michel THIOLLIERE
        • Pal KOVACS
        • Pawel PIKUS
        • Prof. Uwe LEPRICH
        • Rules of Procedure
      • Board_of_Appeal
        • ​ Registry of the Board of Appeal​
        • Announcements of Appeals
        • Decisions
        • Meetings: Agenda, Background documents
        • Members
        • Press Releases
        • Procedural Documents
        • Schedule of Hearings
      • Board_of_Regulators
        • BoR decision tracker
        • Decisions
        • EU Corner
        • Meetings: Agenda, Background Documents
        • Members
        • Opinions
        • Rules of procedure
      • Director
      • Expert_Groups
        • Ad hoc Expert Group on energy commodity derivatives
        • EG_on_REMIT_implementation_measures
          • Composition
          • Meetings
        • EG_on_wholesale_energy_market__surveillance
          • Composition
          • Meetings
        • Electricity Balancing
          • Meetings
        • Electricity Stakeholders
        • Gas Interoperability
          • Meetings
        • Gas Target Model
        • Harmonised Gas Tariff Structures
          • Meetings
        • IT Expert Group for the implementation of REMIT
        • REMIT
          • Ad hoc Expert Group on REMIT
          • Composition
          • Expert group on wholesale energy market trading
          • Meetings
        • Rules for Trading
          • Meetings
      • IAS
      • Task_Forces
      • Working_groups
        • Electricity
          • EWG members
    • Contact us
      • How to reach us
    • Data Protection
    • Missioonja eesmärgid
      • Annual Activity Reports
      • How we work
      • Work programme
      • Work Programme - Previous editions
    • Public procurement
      • Archive
      • Closed calls
      • Contracts awarded
      • CONTRACTS_AWARDED
      • Middle and low value contracts
      • OPEN CALLS
        • MIDDLE_AND_LOW_VALUE_CONTRACTS
    • Working at ACER
      • ​Working environment
      • Career opportunities at ACER
      • Current vacancies
      • Data protection
      • Departments
      • Previous vacancies
      • Reserve lists
      • Selection procedure
      • Traineeship Programme
      • Work-life balance
  • ELienergiaturg
    • Legislation
  • Elektrienergia
    • CONNECTION CODES
      • DEMAND CONNECTION
      • HIGH-VOLTAGE DIRECT CURRENT CONNECTIONS
      • RECORD Tool
      • REQUIREMENTS FOR GENERATORS
    • Framework Guidelines & Network Codes
      • Archived Calls
      • Background and history
      • Balancing
      • Call for comments on the Network Code on Emergency and Restoration
      • CALL FOR INTEREST System Operation European Stakeholder Committee (SO ESC)
      • Capacity allocation and congestion management
        • GridConnection
        • NEMO Designations
      • Grid connection
      • GridConnection
        • NRA contacts for emerging technology applications
      • Harmonised transmission tariff structures
      • System operation
      • System operation – History
    • MARKET CODES
      • CAPACITY ALLOCATION AND CONGESTION MANAGEMENT
        • HISTORY
        • IMPLEMENTATION
          • BIDDING ZONE REVIEW
          • CAPACITY CALCULATION
          • DESIGNATION OF NEMOs
          • MARKET COUPLING DEVELOPMENT
          • POST-COUPLING PROCESSES
          • REDISPATCHING AND COUNTERTRADING
        • MONITORING
          • EXTERNAL REPORTS
        • STAKEHOLDER INVOLVEMENT
      • ELECTRICITY BALANCING
        • HISTORY
        • IMPLEMENTATION
          • BALANCING CAPACITY EXCHANGES
          • BALANCING ENERGY PLATFORMS
          • CAPACITY CALCULATION AND ALLOCATION
          • HARMONISATION
          • SETTLEMENT
        • MONITORING
        • STAKEHOLDER INVOLVEMENT
      • FORWARD CAPACITY ALLOCATION
        • HISTORY
        • IMPLEMENTATION
          • CAPACITY CALCULATION
          • FORWARD CAPACITY ALLOCATION
        • MONITORING
        • STAKEHOLDER INVOLVEMENT
    • Market monitoring
      • 2015 MMR edition
      • 2016 MMR edition
      • Consultancy studies
      • Current edition
      • Earlier editions
      • Methodologies
      • Methodology, objective, background
      • NRA Data Collection
      • Reports
    • Network development and infrastructure regulation
      • Energy Infrastructure Package
      • Infrastructures
        • ACER Opinion on electricity PCI
        • ACER Opinion on the ENTSO-E guideline for cost-benefit analysis of grid development projects
        • ACER Position on the draft electricity CBA
        • ACER Recommendation on CBCA decisions
        • ACER Recommendation on risk evaluation and incentives
        • default
      • Inter-TSO compensation mechanism
      • Network Development
    • OPERATION CODES
      • EMERGENCY AND RESTORATION
      • SYSTEM OPERATION
    • Regional initiatives
      • Background
      • CG Meetings
      • Cross Regional Roadmaps
        • ​Capacity Calculation
        • 1. Market Coupling
        • 2. Cross-Border Intraday
        • 3. LT Transmission Rights
      • Electricity Regional Initiatives
      • Meetings
        • Entry-Point
          • ERI General Calendar
        • Past meetings
        • Projects
          • Capacity-Calculation
          • Cross-Border-Intraday
          • LT-Transmission-Rights
          • Market-Coupling
        • Regions
          • Baltic
          • Central-East
          • Central-South
          • Central-West
          • France-UK-Ireland
          • Northern
          • South-West
      • Reports
      • Work Plan 2011- 2014
  • Maagaas
    • Framework Guidelines & Network Codes
      • Balancing rules
      • Gas Capacity Allocation Mechanisms
      • Gas Network Codes Functionality Platform
      • Harmonised transmission tariff structures
      • Incremental Capacity
      • Interoperability and Data exchange Rules
      • Legal basis
      • NC Amendement Proposals
      • Open call for Gas Capacity Booking Platforms to submit offers for Mallnow and GCP
      • Rules for Trading
      • TAR_IMP
    • Gas Target Model
      • Background
      • default
    • Infrastructure development
      • ACER Recommendation on CBCA decisions
      • Energy Infrastructure Package
      • Review of gas network developments
      • Study on the estimation of the Cost of Disruption of Gas Supply (CoDG) in Europe
      • Ten-Year Network Development Plan (TYNDP) 2017
      • TYNDP 2011-2020
      • TYNDP 2013-2022
      • TYNDP 2015
      • TYNDP 2018
    • Market monitoring
      • Methodology, objective, background
      • Reports
    • Regional Initiatives
      • Background
      • BALTIC-RGMCG
      • CAM Roadmap
      • Gas Regional Initiative
      • Gas Regional Work Plans
      • GRI Calendar
      • GRI Coordination meetings
      • GRI Reports
      • North West GRI
        • IG meetings
        • Public Consultation
          • Consultation outline and content GRIP 2013
          • Final position paper of NRAs within GRI NW on implicit allocation in the gas market
            • Conclusions
            • Stakeholders providing feedback
          • Public Consultation on implicit allocation in the (North West) European gas market
        • RCC meetings
        • Stakeholder Group meetings
      • South GRI
        • CAM AUCTIONS
          • REGULATION IN FRANCE
          • REGULATION IN PORTUGAL
          • REGULATION IN SPAIN
        • CAM Roadmap in the SGRI
        • Joint allocation of capacity between Spain and Portugal
          • Joint allocation of capacity in 2012
          • Joint allocation of capacity in 2013
        • Meetings
          • IG Meetings
          • RCC Meetings
          • SG Meetings
        • NRAs Opinion on GRIP 2011-2020
          • GRIP 2011-2020
        • OSBB
        • Past Meetings
        • Public Consultations
          • Closed public consultation
        • Status of the infrastructures OS 2013 and OS 2015 between Spain and France
        • Transparency
      • South South-East GRI
        • GRI South South-East studies
        • Past Meetings
  • REMIT
    • ABOUT
      • Guidance
      • Q&As
      • Recommendations
      • Regulation
    • ACER guidance
    • Background
    • Cooperation at Union level
    • Expert Groups
    • MARKET_PARTICIPANTS
      • Inside information
      • Market abuse prohibitions
      • Notifications from Market Participants
      • Registration
      • Reporting
    • Overview of the sanction decisions
    • Recommendations on REMIT Records of transactions
    • REMIT IT Experts Group
    • REMITATACER
      • Cooperation
      • Data collection
      • Market surveillance
      • Roundtable
    • TRADING_VENUES
      • Market surveillance
      • Notifications by Persons Professionally Arranging Transactions (PPATs)
  • Documents
    • Acts of the Agency
      • Framework Guidelines
        • Capacity Allocation and Congestion Management for Electricity
        • Capacity Allocation Mechanisms for the European Gas Transmission Network
        • Electricity Grid Connections
        • Electricity System Operation
        • Gas Balancing in Transmission Systems
        • Interoperability and Data Exchange Rules for European Gas Transmission Networks
      • General decisions
      • Individual decisions
      • Opinions
        • Opinions on draft Network Codes
        • Opinions on NRA decisions
        • Opinions on other ENTSOs documents
        • Other Opinions
      • Publications
      • Recommendations
    • Administrative Board
    • Board of Appeal
    • Board of Regulators
    • Director
    • Open Public Consultations
      • Closed public consultations
        • Observations to public notice on the incremental capacity project proposal on the cross-border point at Mosonmagyaróvár of the transmission line (HUAT)
        • Observations to public notice regarding the referral of the exemption request of AQUIND Limited to the Agency
    • Other documents
    • Position Papers
    • Publications
  • Events
    • Public events
      • Previous events
      • Upcoming events
    • Regional Initiatives
      • Electricity
        • Capacity Calculation
          • Previous meetings
          • Upcoming meeting
        • Cross-Border Intraday
          • Previous meetings
          • Upcoming meeting
        • ERI Coordination Group
          • Previous meetings
          • Upcoming meeting
        • Italy North
          • Previous meetings
          • Upcoming meeting
        • LT Transmission Rights
          • Previous meetings
          • Upcoming meeting
        • Market Coupling
          • Previous meetings
          • Upcoming meeting
      • Gas
        • GRI Coordination Group
          • Previous meetings
          • Upcoming meeting
        • North West
          • Previous meetings
          • Upcoming meeting
        • South
          • Previous meetings
          • Upcoming meeting
        • South South East
          • Previous meetings
          • Upcoming meeting
  • Media
    • ACER in all EU Official languages
    • Citizens' summaries
    • Cookies
    • EUROPA Analytics
    • News
    • Pictures
    • Press releases
    • Useful Links
Skip Navigation LinksACER > eesti > Elektrienergia > CONNECTION CODES > DEMAND CONNECTION
  • Amet
    • ​Struktuur
    • Contact us
    • Data Protection
    • Missioonja eesmärgid
    • Public procurement
    • Working at ACER
  • ELienergiaturg
    • Legislation
  • Elektrienergia
    • CONNECTION CODES
    • Framework Guidelines & Network Codes
    • MARKET CODES
    • Market monitoring
    • Network development and infrastructure regulation
    • OPERATION CODES
    • Regional initiatives
  • Maagaas
    • Framework Guidelines & Network Codes
    • Gas Target Model
    • Infrastructure development
    • Market monitoring
    • Regional Initiatives
  • REMIT
    • ABOUT
    • ACER guidance
    • Background
    • Cooperation at Union level
    • Expert Groups
    • MARKET_PARTICIPANTS
    • Overview of the sanction decisions
    • Recommendations on REMIT Records of transactions
    • REMIT IT Experts Group
    • REMITATACER
    • TRADING_VENUES
  • Documents
    • Acts of the Agency
    • Administrative Board
    • Board of Appeal
    • Board of Regulators
    • Director
    • Open Public Consultations
    • Other documents
    • Position Papers
    • Publications
  • Events
    • Administrative Board
    • Board of Appeal
    • Board of Regulators
    • Public events
    • Regional Initiatives
  • Media
    • ACER in all EU Official languages
    • Citizens' summaries
    • Cookies
    • EUROPA Analytics
    • News
    • Pictures
    • Press releases
    • Useful Links
Lehe pilt
Lehe sisu

​​Grid connection

        
Grid connection covers all the issues to establish and maintain a physical connection between the transmission and / or distribution grid and the gr id users. Grid connection is used as a synonym for network connection, which is one of the areas for a network code according to Article 8(6) (b) of Regulation (EC) 714/2009.      
        
The objective of European rules on grid connection is to develop a harmonised electricity grid connection regime that will support a more efficient and secure system operation (particularly important in the context of an increasing penetration of intermittent generation) and will contribute to creating a level-playing field for competition in Europe.       
        
The network code on requirements for grid connection of generators (NC RfG) entered into force on 17 May 2016. It is binding and directly applicable in all Member States as Commission Regulation (EU) 2016/631. 

With the exception of Article 30, the requirements of the NC RfG shall not apply to the power-generating modules (PGMs) classified as an emerging technology, in accordance with the procedures set out in Title VI of the NC RfG and, in particular, Articles 66-70. Article 69 of the NC RfG requires that the relevant NRA decides, by 17 May 2017, in coordination with all the other NRAs of a synchronous area, which PGMs, if any, should be classified as an emerging technology. 

For information on how NRAs implemented the transitional arrangements for emerging technologies in Title VI of the NC RfG please refer to the ACER’s Implementation Monitoring Report of the Network Code on Requirements for Grid Connection of Generators. Moreover, the NRAs agreed to publish, every two months, the accumulated sales (expressed in MW) of power-generating modules classified as emerging technology on ACER webpage. 
  
        
The network code on demand connection entered into force on 07 September 2016. It is binding and directly applicable in all Member States as Commission Regulation (EU) 2016/1388.       
        
The network code on requirements for grid connection of high voltage direct current systems and direct current-connected power park modules entered into force on 28 September May 2016. It is binding and directly applicable in all Member States as Commission Regulation (EU) 2016/1477.      
        
All three network codes provide Member States three years from the date of their publication in the Official Journal of the EU to implement the requirements, save for a handful of requirements that become applicable sooner.       

History​

AMET

  • Missioon ja eesmärgid
  • Organisatsioon
  • Töötamine ACER
  • Riigihangete
  • Kontakt

ELI ENERGIATURUL

  • Õigusaktid

ELEKTER

  • Raamsuunistega & Network Koodid
  • Infrastruktuur & Network Development
  • Piirkondlikud algatused
  • Market Monitoring

GAS

  • Raamsuunistega & Network Koodid
  • Infrastruktuur & Network Development
  • Piirkondlikud algatused
  • Market Monitoring

TERVIKLIKKUSE JA LÄBIPAISTVUSE

  • Taust
  • Acer Arendus-
  • Oluline teave turuosalistele
  • Q & As

AMETLIKUD DOKUMENDID

  • Nõukogust
  • Haldusnõukogu
  • Apellatsiooninõukogu
  • Õigusaktid amet
  • Publications
  • Avalik arutelu

MEDIA

  • Uudised
  • Sündmused
  • Lühikokkuvõtted
  • Kasulikud lingid
  • Sitemap

PUBLICATIONS

  • Aastaaruannetes
  • Tööprogrammidega
  • Teised väljaanded

ACER -

Agency for the Cooperation
of Energy Regulators

Trg republike 3
1000 Ljubljana, Slovenia

tel. +386 (0) 8 205 34 00
fax +386 (0) 8 205 34 13

Comments and feedback
© Agency for the Cooperation of Energy Regulators, 2019.